Skip to navigation Skip to content Skip to footer

Tomasini Stadium

Tomasini Stadium opened on Sept. 15, 2012. The 800 seats on the home side include benches with backs and individuals seats. The facility includes a press box (coaches, media, radio, video and game operations rooms). The seating and press box are connected to the CUW's $11 million, 701 spot, three-story parking structure.